Mudding Started

Home Interior Decorating Exterior Site Pictures Status Reports Planning Archive

Up
Landscaping
Carpet & Tile
Decks & Lights
Deck!
Kids at the house
Mantle!
Kitchen looks great!
Closets and Countertops
Railings
Ceramic Floors
Trim Carpentry
Up-to-Date View
Cabinets
Mudding Started
Drywall Started
Joint Compound
Brick Work
Insulation
Insulation Started
Brick
Roofing
Plumbing
Hardy Board
Windows
Barrel Ceiling
Roof Paper
Roof Structure
Rest of Trusses
Second Floor Walls
Second Floor Started
First Trusses
Main Level Walls
Walls Going Up!
Main Level Floor
Floor Joists
Framing Started!
Delivered Lumber
Compacted Dirt
Rough Grading
Basement Slab
Foundation Sealed
Drains Roughed-In
Poured Foundation
Foundation Forms
Utility Access
Poured Footings
Footings
Huge Hole
Empty Lot

 

April 3, 2007

Mudding has started

Tammy says it'll take about 2 weeks to do the drywall, much of which is waiting for mud to dry: mud, let dry, sand, repeat.

Click on an image to see the full-size version.
20070403house01.JPG (73913 bytes) 20070403house05.JPG (35376 bytes) 20070403house02.JPG (33798 bytes)
The laundry room has been started--around all the joint compound. The garage has its first mudding. The barrel ceiling is going to look great.
20070403house06.JPG (65496 bytes) 20070403house03.JPG (118652 bytes) 20070403house04.JPG (102084 bytes)
Mixing joint compound You can still see the obvious lines from which brick was done which day, but I think it is getting less pronounced. Now that the brick work is done, the roofers are finishing up.