The footings are poured. I guess it makes sense that
foundations go on top of footing. We were able to climb down into
the basement area--that was cool.
 |
 |
 |
| This is the front door area. I'm not sure how the
footings work for where the front door area slab will be. |
Standing about where the utility room will be! |
Why aren't drain tiles made of tile? |
 |
 |
 |
| They covered the entire footing area with straw. |
Each of the three kids had to climb to the top of the Huge
Pile of Dirt. |
Me with Bethy |
 |
 |
 |
| Stan is checking out what will be his garage. (Yes,
his. I get to park in it, but it will be his.) |
Looking toward the south. |
This is where the garage and the basement join
together. I'm not sure how this will work. |