Barrel Ceiling

Home Interior Decorating Exterior Site Pictures Status Reports Planning Archive

Up
Landscaping
Carpet & Tile
Decks & Lights
Deck!
Kids at the house
Mantle!
Kitchen looks great!
Closets and Countertops
Railings
Ceramic Floors
Trim Carpentry
Up-to-Date View
Cabinets
Mudding Started
Drywall Started
Joint Compound
Brick Work
Insulation
Insulation Started
Brick
Roofing
Plumbing
Hardy Board
Windows
Barrel Ceiling
Roof Paper
Roof Structure
Rest of Trusses
Second Floor Walls
Second Floor Started
First Trusses
Main Level Walls
Walls Going Up!
Main Level Floor
Floor Joists
Framing Started!
Delivered Lumber
Compacted Dirt
Rough Grading
Basement Slab
Foundation Sealed
Drains Roughed-In
Poured Foundation
Foundation Forms
Utility Access
Poured Footings
Footings
Huge Hole
Empty Lot

 

February 20, 2007

Framing almost complete

After two weeks of no work (the snow and bitter cold kept everyone indoors, including six days of school closures), it looks as if the framing is almost complete.  The crew said they'd be doing windows Thursday or Friday.

Click on an image to see the full-size version.
20070220house01.JPG (97070 bytes) 20070220house02.JPG (83243 bytes) 20070220house03.JPG (92813 bytes)
The roof paper is up. The barrel ceiling is all framed in. Stan is smiling and getting out of the way of the pictures :-)
20070220house04.JPG (72217 bytes) 20070220house05.JPG (84602 bytes) 20070220house06.JPG (67149 bytes)
This is where it seemed that the plywood was "broken"--now I see why.  It's where two rooflines come together. Looking at the roof paper from one of the upstairs bedrooms. Our street address block was delivered while we were there!
20070220house07.JPG (96617 bytes)    
Stan and Jim (the brick guy)    