Now that the foundation walls are up, some more grading has been done
to push the dirt up to the foundation walls. The framing crew need
something to stand on!
 |
 |
 |
| Looking across the house (to the
north), the ground has been really leveled out. |
This gravel area is where the front
door will go. |
The back yard area is deeper than it looked
when there were still piles of dirt here. I'm standing
about where the air conditioner (and my cutting garden) will go. |
 |
 |
 |
| Looking from the back of the house
towards the front. |
This is the (original) location of
the temporary electric meter. |
The drainage area is no longer the lowest point
in the culvert. |
 |
 |
|
| Looking across the neighbor's
property towards the house. |
Once the house is done, we'll have
to look at how to best landscape. |
|
 |
 |
 |
| Jordan wanted a picture of the
water in the basement, so he climbed down to take this. |
And then handed me the camera so I
could take one of him at the bottom. |
And then climbed out the ladder that was
conveniently left for him. |