
















































|
|
January 16, 2007
Main Level Floor
The site is muddy except where it's frozen. The floor joists
are in and then plywood over them and now they're putting in the next
layer over the plywood. I'm still figuring out how this is going
to be constructed.
p.s. Happy Birthday, Mom.
Click on an image to see the full-size
version.
 |
 |
 |
This "print shed" is protecting the
prints from the snow. |
Hammering—I'm still figuring out
the construction of this! |
The fireplace and the master bedroom window. |
 |
 |
 |
The framing crew is putting
together the cantilevered bay windows. |
Close-up of where the framing comes
together. |
Measure twice. |
Number of visitors:

|