Delivered Lumber

Home Interior Decorating Exterior Site Pictures Status Reports Planning Archive

Up
Landscaping
Carpet & Tile
Decks & Lights
Deck!
Kids at the house
Mantle!
Kitchen looks great!
Closets and Countertops
Railings
Ceramic Floors
Trim Carpentry
Up-to-Date View
Cabinets
Mudding Started
Drywall Started
Joint Compound
Brick Work
Insulation
Insulation Started
Brick
Roofing
Plumbing
Hardy Board
Windows
Barrel Ceiling
Roof Paper
Roof Structure
Rest of Trusses
Second Floor Walls
Second Floor Started
First Trusses
Main Level Walls
Walls Going Up!
Main Level Floor
Floor Joists
Framing Started!
Delivered Lumber
Compacted Dirt
Rough Grading
Basement Slab
Foundation Sealed
Drains Roughed-In
Poured Foundation
Foundation Forms
Utility Access
Poured Footings
Footings
Huge Hole
Empty Lot

 

January 8, 2007

Lumber has been delivered!

It was bright and sunny today—and very cold.  I'm not surprised they didn't start the framing work, but at least the materials are now on-site!

(Correction 1/12: This page used to be "Delivered Wood", but Stan tells me that it isn't Wood.  Wood is to burn. This is Lumber.)

Click on an image to see the full-size version.
20070108house509.JPG (110706 bytes) 20070108house510.JPG (141789 bytes)  
I think these are the floor trusses. Jennica wanted to know why the ends were different colors—and I couldn't tell her.  (11/11:  But Mary Lee couldthe colors indicate the size of the lumber.)  