It's amazing how quickly changes happen during the framing process.
 |
 |
 |
| We have a front door area.
Stan thinks there might be enough shade that a stained from door
won't fade unreasonably. |
The second floor is starting to go
up. The area over the entry is where the barrel ceiling
will be. |
Same picture, but stepped back a bit so that
you can see the study and the master bath/closet area as well. |
 |
 |
 |
| Stan |
Looking into the front bedroom. |
Another picture of Stan :-) |
 |
 |
 |
| Looking down at the master
bath/closet and master bedroom. |
Looking down at the master bedroom
and the great room fireplace |
Looking down at our front door. Stan took
this one--there's no way I'd have leaned over to take it. |
 |
 |
 |
| From the garage, looking up |
Looking across the top of the
garage |
The front of the second floor is over part of
the garage. |
 |
 |
 |
| Along the south side of the
house—you can see the access door for the garage. |
Getting ready to put the next part
of the house together. |
Nailing together trusses (to go up next
Tuesday) |
| |
|
 |
| |
|
The niche at the top of the steps |